操作人員應(yīng)注意自動焊接設(shè)備的使用
來源:http://m.hongqicables.com/ 發(fā)布時間:2023-03-23 瀏覽次數(shù):0
在自動焊接設(shè)備焊接過程中有許多問題需要注意,因為稍不小心就可能會造成人員的傷害或者是設(shè)備的損害。所以,在設(shè)備的使用中要多加注意,那都有什么問題需要注意呢?下面就來一起了解一下吧。
There are many issues that need attention during the welding process of automatic welding equipment, as a slight carelessness may cause personal injury or equipment damage. Therefore, it is necessary to pay more attention to the use of equipment. What issues do you need to pay attention to? Let's take a look together.
1、應(yīng)檢查并確認送絲滾輪的溝槽和齒形完好,滾輪、導(dǎo)電嘴(塊)磨損或接觸不良時應(yīng)更換。
1. The groove and tooth shape of the wire feeding roller should be inspected and confirmed to be intact. The roller and conductive nozzle (block) should be replaced if they are worn or have poor contact.
2、運轉(zhuǎn)前,檢查山東自動焊接設(shè)備減速箱油箱中的潤滑油,不足時添加。軟管式送絲機的軟管槽應(yīng)保持清潔,并定期清潔。
2. Before operation, check the lubricating oil in the gearbox oil tank of Shandong automatic welding equipment, and add it if it is insufficient. The hose groove of the hose type wire feeder should be kept clean and regularly cleaned.
3、在操作過程中,應(yīng)及時排放焊接過程中產(chǎn)生的有害氣體,并在通風(fēng)不良的艙室或容器中安裝通風(fēng)設(shè)備。
3. During operation, harmful gases generated during welding should be promptly discharged, and ventilation equipment should be installed in poorly ventilated compartments or containers.
4、焊槍電纜不可用器具積壓或受重壓,折疊角度不得過小(送絲軟管的半徑不得小于150毫米),否則會損壞內(nèi)部電纜,留下事故隱患。焊接時不得切換電壓調(diào)試開關(guān)。5、焊接操作時,焊機輸出接口等帶電部件不得觸摸。
4. Welding gun cables should not be overstocked or heavily pressed with tools, and the folding angle should not be too small (the radius of the wire feeding hose should not be less than 150mm), otherwise internal cables may be damaged, leaving a potential accident. Do not switch the voltage commissioning switch during welding. 5. During welding operations, live parts such as the output interface of the welding machine must not be touched.
6、面板旋鈕不得切換或調(diào)試過猛,以免損壞設(shè)備。
6. The panel knob should not be switched or adjusted excessively to avoid damaging the equipment.
7、每次山東自動焊接設(shè)備焊接前,檢查焊機是否連接正確,接地線是否可靠。
7. Before each welding with Shandong automatic welding equipment, check whether the welding machine is connected correctly and whether the grounding wire is reliable.
8、不允許敲磚焊機上的熔渣。
8. It is not allowed to knock bricks to remove slag from the welding machine.
9、使用時,應(yīng)在負荷持續(xù)率范圍內(nèi)進行。過載使用會加速部件的老化,降低焊機的使用壽命,甚燒壞焊機。
9. When using, it should be carried out within the range of load duration. Overload use can accelerate the aging of components, reduce the service life of the welding machine, and even burn out the welding machine.
10、通電后,禁止觸摸焊機帶電部分。工作完成或暫時離開現(xiàn)場時,就要切斷輸入電源。
10. After being powered on, it is prohibited to touch the live parts of the welding machine. Cut off the input power supply when completing the work or temporarily leaving the site.
此外檢查每次焊接操作通電前,操作員應(yīng)檢查以下項目:
In addition, before each welding operation is energized, the operator should check the following items:
1、安裝時確保焊機良好的相互接地可靠。
1. During installation, ensure that the welding machines are well grounded and reliable.
2、確保焊機的輸出線和輸入線完好無損且不外露。
2. Ensure that the output and input lines of the welding machine are intact and not exposed.
3、焊機安裝固定后,應(yīng)由熟悉行業(yè)的人員定期進行檢查(多時間不超過6個月)。
3. After the welding machine is installed and fixed, regular safety inspections should be conducted by professionals familiar with the industry (up to a maximum of 6 months).
4、內(nèi)部不得有松動等異常情況。
4. There shall be no abnormal conditions such as looseness inside.
通過以上的介紹,相信大家對自動焊接設(shè)備都有一定的認識,希望以上的介紹可以幫助到大家。更多相關(guān)事項就來我們網(wǎng)站http://m.hongqicables.com咨詢吧!
Through the above introduction, I believe everyone has a certain understanding of automatic welding equipment, and I hope the above introduction can help everyone. For more related matters, please visit our website http://m.hongqicables.com Consult!